[edit] Introduction
Very broadly, foundations can be categorised as shallow foundations or deep foundations. Pile foundations are deep foundations. A foundation is described as 'piled' when its depth is more than three times its breadth.
Piles are formed by long, slender, columnar elements typically made from steel or reinforced concrete, or sometimes timber. The type of pile will determine the pile driving equipment that is most suitable. Other determining factors include; height, manoeuvrability on the site, surface conditions, obstructions such as existing surfaces, and so on.
Piles may be replacement or displacement:
- Displacement piles are driven, jacked, vibrated or screwed into the ground, displacing the material around the pile shaft outwards and downwards instead of removing it.
- Replacement piles remove spoil to form a hole for the pile which is poured in situ.
[edit] Bored (replacement) piles
Bored (replacement) piles require rotary augering equipment. The piling rig is equipped with a telescopic arm or bar known as a Kelly bar which slides vertically and holds a short length of auger or a digging bucket on the end of it. The auger is a drilling device that usually includes a rotating helical screw blade. When the auger or bucket is rotated it excavates the ground. The bar is then retracted, the rig slewed, and the excavated material ejected by spinning the Kelly and tool rapidly.
[edit] Driven (displacement) piles
Driven (displacement) piles require pile drivers. These can be either percussion, hydraulic or vibratory drivers.
[edit] Percussion drivers
These are commonly types of hammer designed to deliver an impact blow to the top of the pile. The type of subsoil and pile will determine both the hammer weight and the drop height. A steel helmet padded with a sand bed and cushioned with a ‘dolly’ (plastic or hardwood block) is used to protect the pile head from damage.
The main types of hammer used in pile driving include:
[edit] Drop hammer
This is a block of iron which is dropped from a rig attached and suspended by rope. The weight typically ranges from 0.75-3 tonnes, and the number of blows which can be delivered with a free fall of 1.2-1.5 m ranges from 10-20 per minute.
[edit] Air hammer
These use compressed air and are either single-acting or double-acting.
Single-acting air hammers are semi-automatic and consist of a heavy failing cylinder sliding up and down a fixed piston, raised by steam or compressed air. The hammer is suspended from a crane and guided by leaders in the piling frame to maintain position relative to the pile head. The hammer rises and falls with the admittance and exhaust of compressed air through valves. Blows delivered can range from 36-75 per minute.
Double-acting air hammers consist of a cast iron cylinder remaining stationary on the pile head while the hammer delivers a series of rapid blows using compressed air. While the force of the hammer is less than that of a single-acting hammer, the number of blows is much greater (ranging from 95-300 per minute). This type of hammer is suitable in situations where the use of a conventional hammer is prohibited by reduced head-room.
[edit] Diesel hammer
These are self-contained units suspended from a crane or slide-in leaders rested on the pile head. A falling cylinder of steel within the unit generates the driving action, raised by the explosion of gas from the automatic injection of fuel. The cycle continues until the fuel is cut off. Hammers weigh from 2-6 tonnes, and the number of blows ranges from 40-60 per minute.
[edit] Hydraulic drivers
Hydraulic drivers are typically used for sheet piles, pushing them into the ground by means of a hydraulic ram. An example of a hydraulic driver is the ‘Still Worker’ designed by the Japanese firm Tosa.
[edit] Vibratory drivers
Vibratory drivers are used to vibrate the piles, reducing the surrounding ground resistance, and allowing them to pass into the ground. Depending on the nature of the soil the vibrations can be either low or high frequency, although they should not be used in heavy clays as the vibrations tend to be dampened. The vibrators are driven by diesel-hydraulic power units.
[edit] Pile extraction
The speed and method of extraction will depend on factors including:
- The ground and water conditions.
- How long the piles have been in the ground.
- The pile section and length.
- The driving method and hammer weight.
Pile extractors deliver a rapid number of upward blows which cause the extracting jaws to grip and lift piles out of the ground. Alternatively, a double-acting hammer can be inverted for use, working on the principle of hitting the pile out of the ground.
[edit] Related articles on Designing Buildings
Featured articles and news
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.